On-site Sewage - WAC 246-272A Going off site...

If you are planning to construct a new home or other structure with plumbing and will not be hooking up to a municipal sewer system, you will need an on-site sewage system (OSS). It is required that you have an OSS permit issued and an approved Water Adequacy Determination (Water Availability), before the building department will release the building permit.

Step by step process to installing an on-site sewage system

  1. Site Evaluation
    To obtain an OSS installation permit you will first need to have a site evaluation on the proposed project parcel. The site evaluation is performed by an Environmental Health Specialist from the Kittitas County Public Health Department and a Washington State licensed on-site designer. This evaluation of soil and site characteristics will determine the suitability for an OSS on the parcel. During the evaluation, the type of OSS (gravity, pressure distribution, or alternative system), the soil loading rate, and other landscape and environmental factors will be determined. To obtain a site evaluation, submit the site evaluation application (link to application is below) and fee to the Kittitas County Public Health Department. The site evaluation fee is $400.00 and is payable by check or cash only.
  2. OSS Design
    After the site evaluation is complete, the next step will be to have an OSS design prepared by a licensed on-site designer. Homeowners wanting to prepare their own OSS system design are allowed to do so, but only for gravity flow systems. If you wish to prepare your own gravity flow system design, you are required to schedule a pre-design meeting with an Environmental Health Specialist and pay an additional fee of $215. All other types of OSS systems must be designed by a licensed on-site designer.
  3. Installation
    Once the OSS design has been reviewed and approved, an OSS installation permit will be issued (fees for permit vary.) This installation permit is valid for one year from the date of issuance. A one-year renewal permit may be issued if the application is submitted before the expiration date of the original installation permit. Homeowners are allowed to install their own OSS system. A Kittitas County OSS Installers license is required for all septic system installers and septic tank pumpers contracting work in Kittitas County. These licenses are available through the Kittitas County Public Health Department.
  4. Inspection
    All OSS systems installed must be inspected by an Environmental Health Specialist prior to back fill. The installer or designer may schedule these inspections directly with the Kittitas County Public Health Department.

Inspections

Licensed designer and installers may request an inspection online. You will receive a confirmation email once the requested inspection has been scheduled.

View scheduled inspections >

More Information

Contact: Joe Gilbert, Environmental Health Specialist II, (509) 933-8262, environmentalhealth@co.kittitas.wa.us

  

Public Health's home |  About us |  Programs |  Board of Health |  Advisory Committee |  Fees |  Forms |  Quarterly reports |  Community resources |  FAQs |  Contact Public Health
County home |  Sitemap |  Departments |  How do I... |  Help me find... |  Public records request |  Contact us |  Employees


 

Privacy Notice |  Disclaimer |  Terms of Use |  Traduzca al español
All inquiries regarding services and all public disclosure requests should be directed to the elected official or department head of the appropriate office. Thank you.
For comments regarding the operation of the website, email the Kittitas County Webmaster .
Static content last modified on 2012/1/3
Copyright © 2012 - Kittitas County - All Rights Reserved.

Access WA  Kittitas County